Central Asia Metals plc

Central Asia Metals plc Earnings Recaps

CAML.L Materials 2 recaps
Next earnings: March 30, 2027 (estimated) · full calendar
Q2 2026 Aug 28, 2026

The 4.1% post-earnings stock jump reflects a solid beat driven primarily by robust revenue and EBITDA growth supported by favorable commodity prices and strong operational performance.

Key takeaways
  • Revenue increased to $145.5 million from just under $100 million in H1 2025, driven by a 39% higher copper price and 26% higher zinc prices.
  • EBITDA nearly doubled to $75.5 million with a margin of 52%, reflecting improved profitability.
  • Production modestly increased: copper output up 1% despite adverse weather, zinc up 5%, and lead up 6% at the Sasa mine.
  • Treatment charges fell significantly by $2.2 million to $2.7 million, helped by locked-in negative lead treatment charges.
  • Cash flow of $46.8 million supported an 8p dividend payout (40% of free cash flow) and left $97.2 million cash on hand, maintaining a strong balance sheet for growth investments.
Q2 2025 Sep 10, 2025

Central Asia Metals reported stable revenue of $99.5 million in H1 2025 despite lower sales volumes, driven by operational efficiency and reduced treatment charges, while maintaining strong returns to shareholders through dividends and share buybacks.

Key takeaways
  • Copper production from Kounrad reached 6,218 tonnes; Sasa produced 8,692 tonnes of zinc and 12,613 tonnes of lead, achieving zero lost time injuries.
  • EBITDA of $39.9 million reflects a 40% margin; implemented a dividend of 4.5p and initiated a $10 million share buyback program.
  • Revenue remained stable year-over-year, down only 2%, boosted by lower treatment charges despite a 14% rise in cost of sales.
  • Strong balance sheet with $47.7 million in cash; beneficial currency fluctuations from the Kazakh tenge devaluation improved operational cost reporting in USD.